Final Disposal of Nuclear Waste

Spent nuclear fuel stays hazardous for hundreds of thousands of years. The accepted plan is burial in stable rock several hundred meters down behind several barriers, and most spent fuel meanwhile sits in interim storage. The first deep repository for commercial spent fuel, Onkalo in Finland, is only now nearing its operating license. The science is largely settled, but siting with local consent, licensing, cost and proving safety over timescales no experiment can run remain hard.

Open in the interactive tree →

Spent fuel stays hazardous for hundreds of thousands of years, so the accepted plan is burial in stable rock several hundred meters down behind several barriers, such as iron-copper canisters in bentonite clay at Onkalo in Finland. The science is largely settled; the hard parts are siting with local consent, licensing, cost and proving safety over timescales no experiment can run. Meanwhile most spent fuel sits in interim storage.

As of now

The IAEA's tool counts 447,758 metric tons of heavy metal of spent fuel discharged worldwide by June 24, 2026, about 322,000 in storage and about 126,000 reprocessed. In Finland the regulator STUK gave Onkalo a favorable safety assessment in August 2026, covering at least 100,000 years; the government's license decision is expected in autumn and operator Posiva aims to be ready to start disposal by the end of 2026, with drilling of the first deposition hole under way. Sweden began construction at Forsmark on January 15, 2025, for waste in the 2030s; France's inquiry commission gave Cigéo a favorable opinion in August 2026 but the authorization decree is still missing; Germany's agency plans to hand over proposed siting regions by the end of 2027 after the legal 2031 target was judged unreachable; Switzerland's framework license procedure for Nördlich Lägern is ongoing. The US has no permanent repository: Congress ended Yucca Mountain funding in 2011.

What is missing

  • A first working repository for commercial spent fuel: Onkalo still awaits its government license and first canister
  • Host sites with local consent in countries still searching; on September 7, 2026, Switzerland's federal councillor made fair compensation a condition for the license
  • Cost control: Cigéo's industrial reference cost is 33.36 billion euros (2025 prices), up from 25 billion in 2016
  • Evidence that barriers hold for 100,000 years and more, from models, natural analogs and underground laboratories
  • A long-term answer for the roughly 322,000 metric tons of spent fuel now in storage

Becomes possible once solved

  • Nuclear expansion with a credible answer to the waste question
  • Emptying and closing interim storage pools and cask yards
  • A template for countries starting nuclear programs

Open steps

  • Better Nuclear Waste Glass and Ceramics High AI leverageDesign glass and ceramic waste forms that hold more waste and resist dissolution, using machine-learned property models and active learning.
  • Fast Models of Radionuclide Transport High AI leverageBuild validated surrogates of coupled flow, chemistry and heat in repository rock and clay, so safety cases can test millions of scenarios over up to a million years.
  • AI Review of Nuclear Repository Safety Cases Medium AI leverageTest whether AI can find, cite and cross-check evidence across decades of safety-assessment documents, scored against expert analyses of Yucca Mountain.
  • Nuclear Waste Barriers Lasting 100,000 Years Medium AI leverageCombine natural analogs, long experiments and models to show that canisters, bentonite buffer and host rock keep radionuclides in for 100,000 years and more.
  • Siting Nuclear Repositories with Consent Low AI leverageFind repository sites that meet geology criteria and win local consent, as Germany's search (siting-region proposal due end 2027) and Switzerland's compensation question show.

Where today's AI could help

Low AI leverage. Consent, licensing, cost and construction set the pace, not computation; AI helps with waste-form design, transport models and safety-case review.

  • Design waste glass and ceramics that hold more waste and resist dissolution
  • Speed repository transport and barrier simulations with surrogate models
  • Search and cross-check decades of safety-case documents
  • Optimize canister logistics and repository layouts

Shown so far

  • On September 22, 2026, a PNNL-led paper in the Journal of Non-Crystalline Solids reported the first experimental validation of machine-learning-designed low-activity waste glass: retrained models gave better predictions, fewer failures and higher waste loading. source
  • On September 17, 2026, the University of Nevada, Reno announced a DOE Genesis Mission project that tests over nine months whether AI can reason from Yucca Mountain safety-assessment evidence as well as established expert analyses; there are no results yet. source
  • In February 2026, Germany's MALEK project (about 1.7 million euros, 36 months) was announced to train surrogate models on detailed simulation data for sorption and reactive transport in crystalline rock, with scales from millimeters to kilometers and up to one million years. source